Health and safety
Safety Is Built Into Our Service
Site specific safety, not a one size fits all approach
Every Site, Different Risks
Every Site, Different Risks
Assess Before We Begin
Assess Before We Begin
Safety Through Preparation
Safety Through Preparation
For us, good health and safety is not about producing paperwork for the sake of it. It is about making sure our people understand the work, know what to look out for and have the training, equipment and information they need to do the job safely.
How we manage risk
Site assessment
Site assessment
Our planning starts with the site itself. We identify relevant hazards, access conditions, occupied areas, emergency arrangements, security requirements and any contractor or customer specific health and safety requirements that apply.
Understanding the environment before work begins helps us plan around the people using the property and reduce avoidable risks for both our team and yours.
Risk assessment and task planning
Risk assessment and task planning
The agreed cleaning scope is considered alongside the risks associated with the work. We assess the cleaning tasks, chemicals, manual handling, wet floor exposure, machinery, vehicles, public interaction and any restricted access or elevated work that may be required.
From there, we confirm the appropriate work method, timing, PPE, signage, equipment, supervision and escalation process.
Reporting, incidents and review
Reporting, incidents and review
Conditions can change after a service begins, which is why health and safety does not stop once the first induction is complete.
Hazards, incidents, access issues and changing site conditions are reported through the agreed process and escalated when required. If the existing method is no longer suitable, our people are expected to stop, reassess and seek guidance rather than simply continue.
Controls are reviewed when the work, people, products, equipment or site conditions change.
Chemical safety and Safety Data Sheets
Chemical safety and Safety Data Sheets
Cleaning chemicals are selected for the task and used in accordance with their labels, dosing instructions and Safety Data Sheets.
Controlled dosing and clear product instructions also help our team use chemicals consistently and avoid unnecessary exposure or misuse.
Products are stored and labelled appropriately, and SDS information is kept available for the chemicals our team uses so that hazard, handling, first aid and emergency information can be accessed when needed.
Training, competency and induction
Training, competency and induction
Our people are not expected to work independently until they have the information and training relevant to their role.
This includes company induction, site specific induction, task instructions, equipment training and any competency requirements associated with specialist work. Where a customer requires contractor inductions, permits, sign offs or specific site documentation, those requirements are completed before the relevant work begins.
Equipment and PPE
Equipment and PPE
The right equipment makes a significant difference to both safety and the quality of the work.
We select equipment based on the task and site, check it before use and ensure it is operated by people with the appropriate instruction or competency.
We also provide the PPE required for the work. Depending on the task, that may include gloves, protective footwear, eye protection, respiratory protection, high visibility clothing, hearing protection or height safety equipment.
PPE is only one part of the control process. Where a hazard can be eliminated or reduced through a safer method, equipment choice or change in approach, that remains the preferred option.
Independent proof of our health and safety systems
Before the first shift
Identify
1
Assess
2
Control
3
Document
4
Brief and verify
5
Working at height and specialist tasks
Safety that continues throughout the service
Frequently Asked Questions
SiteWise reviews contractor health and safety information and provides a prequalification grading. They provide independent evidence of our systems, but site specific risk assessment, onboarding and controls are still completed for the individual service.
Yes we certainly can. Safety Data Sheets are kept available for the chemicals used by our team and can be supplied or made accessible as part of customer onboarding and site requirements.
We will always provide the PPE our people require for the agreed task and site. The final selection is based on the product, equipment, hazards and customer requirements identified during assessment and onboarding.
Unfortunately, no. We have hand selected the best people to sit these qualifications for us. Elevated work is only assigned where the person, equipment, access method, competency and site controls are appropriate for the task.
Our team follows the agreed reporting and escalation process, makes the immediate area safe where practical and stops or changes the work when continuing would be unsuitable. The matter is then reviewed and any required corrective action, updated control or change to the work method is documented.